-
LakeView Residence
Client: LakeView Residence Company
Consultant: Abou Zeid Engineering Consultants
Location: New Cairo, Cairo , Egypt
Year: June 2016 – June 2020
Scope of Work: Core and shell works for 118 buildings over 77 acres of land , external finishes , infrastructure and landscape and includes a commercial mall over 400,000 m2 on a turnkey basis -
Hyde Park
Client: Damac Properties
Location: Hyde Park Compound, New Cairo, Cairo , Egypt
Year: 2009 - 2014
Scope of Work: Core and shell scope for 130 villas with a total area of 271,000 m2 -
Costa Del Sol
Client: Cannes Real Estate Investment
Location: North Coast , Egypt
Year: 1998 - 2005
Scope of Work: Exclusive 140 villas each with sea view & private garden , and two large swimming pools & a clubhouse -
Noor
Client: Talaat Moustafa Group
Scope of Work: The scope of works contains the construction work for 54 Buildings [4 Types] each type is fully finished consisted of ground, seven floors and roof with total buildings built up area 255,197 M2 and 8 parking with total built up area 27,307.08 M2 including Infrastructure works.
Year: 2022
Location: Suez Road -
Shalya Taj City
Client: Madinet Nasr for Housing and Development - MNHD
Scope of Work: Core and shell works for 28 buildings consist of 3 types with a total BUA 94,415 m2. The scope of work includes backfilling, soil replacement, concrete, masonry, insulation, metal works, steel and wooden doors, stone and marble, plaster, painting, electrical works and mechanical works.
Year: 2022
Location: New Cairo - Ring Road -
El Baron Tower
Location: Heliopolis, Cairo
Year: 1994
Scope of work: In one of the most magnificent districts in the middle of Heliopolis, exists El Baron Tower, located on 1,800 m2
The Tower has a basement and 7 above ground floors with 2 elevators. Each floor has 2 apartments with an area of 450 m2 each. -
Parcel G&M
Client: Marakez For Real Estate Development
Scope of work: The scope of works consists of 2 residential parcels including the concrete works, masonry & external plaster works in addition to the MEP works.
Year: 2022
Location: Cairo - Ain Sokhna Road -
Mivida
Client : Emaar Misr
Consultant : Associated Consulting Engineers (ACE)
Location: New Cairo
Starting Date : June 2018.
Duration : 28 Months
Scope of Work : Completion and guarantee of construction package 135 forming part of the project known as Parcel 24 buildings infrastructure and plot fences works. The work includes, construction of 54 semifinished town homes infrastructure, and plot fences with BUA of 571 m2 approximately for each building with a total built-up area of 30,804 m2. -
Villette
Client: Sixth of October for Development and Investment Co.(Sodic)
Consultant: Active Brains Consulting Group (ABCG)
Location: New Cairo, Cairo
Starting Date : Dec, 2018.
Duration: 21 Months.
Scope of Work: Core and shell works for 14 buildings and 11 townhomes, including earthwork concrete work, mechanical Works, electrical Works, and external finishes.
-
Keeva
Client: Al Ahly Sabbour Developments
Consultant: Sabbour Consulting
Scope of Work: Core and shell works for 6 types of bildings with electromechanical works, Semi finishing works for 3 types of buildings with civil and electromechanical works and semi finishing of villas (Towns,Twins) for 13 types consistf of civil and electromechanical works with a total BUA 125,000 m2
Year: 2022
Location: 6th of October -
Al Burouj
Client: Capital Group Properties for Real Estate Development ( Imkan Misr ).
Designer: EHAF Consulting Engineers and Raafat Miller Consulting ( RMC).
Supervision Consultancy : Engineering Consultants Group (ECG).
Location: Km 42 south Cairo -Ismailia Road .
Starting Date : Jan ,2020
Duration : 32 Months.
Scope of Work : The Scope of Works shall include two fully finished parcels. Parcel 1.05a, consists of 32 villas and 64 units with total BUA 17,472 sqm with its landscape and infrastructure and Parcel 1.11,4 residential ( B,G&6 floors) buildings with a total of 126 apartments including its landscape. -
Naama View
Client: Egyptian Union for Investments.
Location: Sharm El Sheikh.
Year: 2006-2008
Scope of Work : 33 residential blocks (each in the range of 450 m2), 3 building (each in the range of 600 m2), commercial mall, service building, landscape, swimming pools (1,300m2), and lakes (3,400 m2).
X